Australian civil · mining · construction

The compliance work, already built.

Management systems, training packs and verifications of competency — priced, documented, and ready the day you buy them. Built by people who have carried a management system on a site, not by a software company that read about one.

Documents and revisions · 5 of many
HS-03Working at Heights ProcedureCurrent
QP-06Internal Audit ProcedureCurrent
EN-02Environmental Aspects RegisterReview due
HS-11Plant Isolation StandardCurrent
QP-01Document Control ProcedureCurrent

An example of the register, not a screenshot of one. Real captures go here when the demo system has a dataset worth showing.


What we sell

Three products. One account.

Each one stands on its own. Together they share a spine — training records land in the management system, and the verifications land beside them.

TW-IMS

Management system

Documents, risk, incidents, competency, plant, suppliers, audits and management review in one system, built to ISO 9001, 14001 and 45001. Your own database, in your own account, in Australia.

From $450a month, per site — every one of your people on it, at no extra cost
TW-TRN

Training packs

Nationally aligned RII and CPC packs. Every document rendered from one source file, with the mapping matrix computed rather than typed. Licence it, brand it as your own, export it in Word, PowerPoint or PDF.

$218.90a pack, inc GST — bought once, licensed to you with no expiry
TW-VER

Verification of competency

The SME who watched the practical, the TAE-qualified assessor who made the decision, and a certificate carrying a QR code a gate can scan. Not a signature on a form nobody can trace.

Not open yetThe packs are built and the process is settled; the platform side is being finished.

Platform prices are per site and include unlimited users — the bands are on the pricing page. Packs are bought once and never expire, because an auditor can ask to see one years after the training was delivered.


Why it costs you

Admin doesn’t appear on the P&L. It appears in everyone’s week.

There is no line item called administration. There is a supervisor rebuilding a training matrix in a spreadsheet, a coordinator chasing tickets that expired last month, and a week before every audit spent assembling evidence that already existed somewhere.

None of it is billable. All of it is paid for. And because it is spread across a dozen people’s weeks rather than sitting in one budget, it is the cost most businesses never measure and never cut.

That is the whole job. Not software for its own sake — a smaller number of hours going into work nobody pays you for.

What comes off the week
Assembling evidence before an auditSystems
Chasing expired tickets and competenciesSystems
Typing the same data into three placesSystems
Building the monthly report from scratchSystems
Writing and re-writing training materialTraining
Rebranding packs by hand for each clientTraining
Running a VOC and filing the paperwork after itVerify
Proving at a gate that a verification is realVerify

Not claims

Numbers out of the system, not out of a brochure.

58
automated checks, on ISO 9001, 14001 and 45001
80
requirements mapped across 12 standards
8
documents in every training pack, all rendered from one source file
45
performance criteria mapped in a single unit — computed from the pack, never typed

11 of the 80 cannot be evidenced by software at all — a person has to be there. We say so on the platform page rather than in a headline, because it is a limit of the category and not a feature of ours.



Who we build for
Civil contractorsEarthmoving and plant hireMining servicesTraffic managementRegistered training organisationsLabour hireSole operators
Not made yetSixty seconds on what the three lines actually do. It is being cut now — no voiceover, no stock-footage montage, and no claim in it that is not already on this page.
Start here

Tell us what’s eating the week.

Describe the part of your operation that takes the most hours and produces the least invoice. We’ll tell you which of the three applies — including when the answer is none of them.